A first order from China rarely costs just the unit price multiplied by quantity. A workable budget separates one-off costs from per-unit costs, adds packaging, freight and inspection, and holds a contingency for the unknowns. The right number depends on your product and destination, so build it line by line rather than guessing a single figure.
Decide what the budget has to cover
Before putting numbers against anything, fix the scope of the first order. Is it a stock item with your logo, a lightly modified product, or something fully custom that needs a new mould? Is packaging supplied by the factory or by you? Who arranges freight and inspection? Each answer adds or removes a cost line, and vague answers are where first-order budgets go wrong.
A useful starting point is a written brief that states the product, specification, approximate quantity, customization and destination. A clear sourcing brief removes much of the guesswork from the quotations you will base the budget on.
The cost lines in a first order
- Samples — prototype and pre-production samples, often charged separately and sometimes credited against the first order.
- Tooling or moulds — a one-off cost for custom shapes, logos or injection moulds; confirm who owns the tool afterwards.
- Goods — the unit price multiplied by quantity, usually with a deposit and a balance payment.
- Packaging — retail packaging, inner packing and export carton, which may be priced separately from the product.
- Testing and certification — only where the product and destination market require it; confirm what is actually needed.
- Inspection — a pre-shipment check, commonly arranged with a specialist provider.
- Freight, duties and taxes — market-specific; confirm rates and rules with the relevant authority or a licensed broker.
- Service or coordination fees — agreed separately for any sourcing or follow-up support.
Example budget breakdown
Example (illustrative only): A small custom product, first run of 3,000 units, shipped to one destination. These are made-up numbers to show the structure, not a real quote.
| Cost line | Basis | Example amount |
|---|---|---|
| Samples | Prototype plus approved sample | $150 |
| Tooling / mould | One-off, custom logo plate | $800 |
| Goods | 3,000 × $1.20 unit price | $3,600 |
| Retail packaging | Printed box and inner packing | $450 |
| Inspection | Pre-shipment, specialist provider | $250 |
| Freight and duties | Confirm locally; varies by market | $700 |
| Sourcing / coordination | Agreed separately | By agreement |
| Contingency | Around 10% of the above | ~$595 |
| Indicative total | ~$6,545 |
Why the one-off versus per-unit split matters
Tooling and samples are paid once; goods and most packaging scale with quantity. That is why a larger first run can lower the unit cost but raise the total cash you need up front. When you compare quotations beyond unit price, check whether tooling and packaging are inside the unit price or listed separately. Two quotes that look far apart can end up close once the one-off items are treated the same way.
Steps to build your own number
- Write the brief and fix specification, quantity and destination.
- Request quotations that break out tooling, samples, packaging and freight as separate lines.
- Add inspection and any required testing as their own items.
- Total the one-off and per-unit costs, then add a contingency of roughly 5–15% depending on how custom the product is.
- Confirm duties, taxes and shipping rules with the relevant authority before committing.
Kubo Sourcing coordinates supplier sourcing, quotation comparison, sample coordination and order follow-up, with inspection and shipping coordinated with specialist providers — scope and charges agreed separately. Send us your product details →
Frequently asked questions
How much contingency should a first order budget include?
There is no fixed rule. A modest 5% may be enough for a stock product with few unknowns; a custom product with new tooling and packaging often justifies 10–15%. Treat it as a planning buffer, not a price to negotiate away.
Are samples always credited against the first order?
No. Some suppliers credit sample fees against a production order and others do not. Ask for this in writing when you request the sample so the budget reflects the real cost.
Do duties and taxes belong in the budget?
Yes, if goods are imported into your market. Rates and rules are market-specific, so confirm them with the relevant customs authority or a licensed broker rather than relying on a generic estimate.